Best Well Installation in Riverside, CA
Compare 17 local well installation providers in Riverside. Verified listings with real contact info.
17 services listed
Quick Compare
BP Riverside Plumbing
3615 Main St STE 103, Riverside, CA 92501
Monday: 7:00 AM – 8:00 PM | Tuesday: 7:00 AM – 8:00 PM | Wednesday: 7:00 AM – 8:00 PM | Thursday: 7:00 AM – 8:00 PM | Friday: 7:00 AM – 8:00 PM | Saturday: 7:00 AM – 8:00 PM | Sunday: 7:00 AM – 8:00 PM
5 ★
55 reviews
Cisneros Brothers Plumbing, Heating & AC Repair
2001 3rd St c, Riverside, CA 92507
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.9 ★
730 reviews
20/20 Plumbing & Heating. Inc. (Service)
1650 Seventh St, Riverside, CA 92507
Monday: 7:00 AM – 5:00 PM | Tuesday: 7:00 AM – 5:00 PM | Wednesday: 7:00 AM – 5:00 PM | Thursday: 7:00 AM – 5:00 PM | Friday: 7:00 AM – 7:00 PM | Saturday: Closed | Sunday: Closed
5 ★
15 reviews
First Place Plumbing Solutions Riverside CA
4680 Beverly Ct, Riverside, CA 92506
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
153 reviews
Best Drilling and Pump, Inc.
1640 Pellisier Rd, Colton, CA 92324
Monday: 8:00 AM – 4:00 PM | Tuesday: 8:00 AM – 4:00 PM | Wednesday: 8:00 AM – 4:00 PM | Thursday: 8:00 AM – 4:00 PM | Friday: 8:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
3.8 ★
6 reviews
Berchtold Water Well & Pump
2762 St Lawrence St #2013, Riverside, CA 92504
5 ★
2 reviews
Rivera Water Pump & Well Services
4766 Valley Forge Dr, Riverside, CA 92509
4 ★
4 reviews
General Pump Company
1324 W Rialto Ave, San Bernardino, CA 92410
Monday: 7:00 AM – 4:00 PM | Tuesday: 7:00 AM – 4:00 PM | Wednesday: 7:00 AM – 4:00 PM | Thursday: 7:00 AM – 4:00 PM | Friday: 7:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
2 ★
4 reviews
Great West Drilling Inc
9431 Resenda Ave, Fontana, CA 92335
3.7 ★
3 reviews
Layne, A Granite Company
1717 W Park Ave, Redlands, CA 92373
Monday: 8:00 AM – 5:00 PM | Tuesday: 8:00 AM – 5:00 PM | Wednesday: 8:00 AM – 5:00 PM | Thursday: 8:00 AM – 5:00 PM | Friday: 8:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.4 ★
8 reviews
Work Yellow Jacket Drilling Services
9460 Lucas Ranch Rd, Rancho Cucamonga, CA 91730
4.3 ★
14 reviews
Cal Pac Drilling Well Dvlpng
526 W Ave L, Calimesa, CA 92320
4.1 ★
7 reviews
Well Tec - Pump and Water Well Service
531 Edgar Ave, Beaumont, CA 92223
Monday: 7:30 AM – 4:30 PM | Tuesday: 7:30 AM – 4:30 PM | Wednesday: 7:30 AM – 4:30 PM | Thursday: 7:30 AM – 4:30 PM | Friday: 7:30 AM – 4:30 PM | Saturday: Closed | Sunday: Closed
4 ★
4 reviews
General Pump Company Inc.
159 N Acacia St, San Dimas, CA 91773
Monday: 7:30 AM – 4:00 PM | Tuesday: 7:30 AM – 4:00 PM | Wednesday: 7:30 AM – 4:00 PM | Thursday: 7:30 AM – 4:00 PM | Friday: 7:30 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.4 ★
19 reviews
L O Lynch Quality Wells & Pumps Inc
856 W 7th St, San Jacinto, CA 92582
Monday: 7:00 AM – 4:00 PM | Tuesday: 7:00 AM – 4:00 PM | Wednesday: 7:00 AM – 4:00 PM | Thursday: 7:00 AM – 4:00 PM | Friday: 7:00 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.4 ★
22 reviews
Southwest Pump & Drilling
1481 Mesa View St, Hemet, CA 92543
3 ★
2 reviews
DeTray Drilling & Well Pump Service
34130 Elliot Rd #9158, Winchester, CA 92596
Monday: 8:00 AM – 6:00 PM | Tuesday: 8:00 AM – 6:00 PM | Wednesday: 8:00 AM – 6:00 PM | Thursday: 8:00 AM – 6:00 PM | Friday: 8:00 AM – 6:00 PM | Saturday: 8:00 AM – 6:00 PM | Sunday: Closed
4.4 ★
7 reviews
Frequently Asked Questions
How much does a complete well installation cost in California?
A complete well installation typically costs $12,000 to $25,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. Bedrock wells are at the higher end. State permitting requirements, mandatory water quality testing, and well completion reporting add to the total cost.
What's included in a complete well installation in California?
A complete installation includes state-required permits, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and mandatory initial water quality testing per state code.
How long does it take to install a complete well system in California?
The entire process typically takes 4-8 weeks from permit application to final approval. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing and electrical connections 1-2 days. Water testing results take 5-10 business days. Permit and inspection timelines vary by jurisdiction.