Best Well Installation in Santa Ana, CA
Compare 19 local well installation providers in Santa Ana. Verified listings with real contact info.
19 services listed
Quick Compare
Cascade Environmental
1225 E McFadden Ave, Santa Ana, CA 92705
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
5 ★
2 reviews
LDO Property Improvement Services
2727 Mainplace Dr apt 525, Santa Ana, CA 92705
Monday: 9:00 AM – 5:00 PM | Tuesday: 9:00 AM – 5:00 PM | Wednesday: 9:00 AM – 5:00 PM | Thursday: 9:00 AM – 5:00 PM | Friday: 9:00 AM – 5:00 PM | Saturday: 9:00 AM – 5:00 PM | Sunday: 9:00 AM – 5:00 PM
5 ★
9 reviews
Most Valuable Plumber
171 S Anita Dr Suite 215, Orange, CA 92868
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
4.9 ★
230 reviews
Continental Drilling US
17692 Cowan # 200, Irvine, CA 92614
5 ★
2 reviews
Moffett Plumbing & Air
1863 N Neville St, Orange, CA 92865
Monday: 7:00 AM – 6:00 PM | Tuesday: 7:00 AM – 6:00 PM | Wednesday: 7:00 AM – 6:00 PM | Thursday: 7:00 AM – 6:00 PM | Friday: 7:00 AM – 6:00 PM | Saturday: 8:00 AM – 5:00 PM | Sunday: Closed
4.9 ★
1320 reviews
Swave Solutions Inc
1355 Logan Ave #7, Costa Mesa, CA 92626
Monday: 9:00 AM – 5:00 AM | Tuesday: 9:00 AM – 5:00 AM | Wednesday: 9:00 AM – 5:00 AM | Thursday: 9:00 AM – 5:00 AM | Friday: 9:00 AM – 5:00 AM | Saturday: Closed | Sunday: Closed
4.9 ★
23 reviews
Well Water USA LLC
15131 Triton Ln # 104, Huntington Beach, CA 92649
4 ★
1 reviews
Pump Systems Inc
15000 Bolsa Chica St, Huntington Beach, CA 92649
M R Drilling
13124 Firestone Blvd, Santa Fe Springs, CA 90670
Monday: 6:00 AM – 5:00 PM | Tuesday: 6:00 AM – 5:00 PM | Wednesday: 6:00 AM – 5:00 PM | Thursday: 6:00 AM – 5:00 PM | Friday: 6:00 AM – 5:00 PM | Saturday: Closed | Sunday: Closed
4.3 ★
12 reviews
Groomans Pump & Well Drilling
2444 Emerson Cir, Corona, CA 92882
3 ★
1 reviews
Jet Drilling
2656 St Louis Ave, Signal Hill, CA 90755
Monday: Open 24 hours | Tuesday: Open 24 hours | Wednesday: Open 24 hours | Thursday: Open 24 hours | Friday: Open 24 hours | Saturday: Open 24 hours | Sunday: Open 24 hours
5 ★
1 reviews
ABC Liovin Drilling Inc
1180 E Burnett St, Signal Hill, CA 90755
Monday: 8:00 AM – 6:00 PM | Tuesday: 8:00 AM – 6:00 PM | Wednesday: 8:00 AM – 6:00 PM | Thursday: 8:00 AM – 6:00 PM | Friday: 8:00 AM – 6:00 PM | Saturday: Closed | Sunday: Closed
4.2 ★
11 reviews
C&J Energy Services
19431 S Santa Fe Ave, Compton, CA 90221
4.4 ★
10 reviews
General Pump Company Inc.
159 N Acacia St, San Dimas, CA 91773
Monday: 7:30 AM – 4:00 PM | Tuesday: 7:30 AM – 4:00 PM | Wednesday: 7:30 AM – 4:00 PM | Thursday: 7:30 AM – 4:00 PM | Friday: 7:30 AM – 4:00 PM | Saturday: Closed | Sunday: Closed
4.4 ★
19 reviews
Big Johnny's Drilling
1171 E Laxford Rd, Azusa, CA 91702
5 ★
1 reviews
Rivera Water Pump & Well Services
4766 Valley Forge Dr, Riverside, CA 92509
4 ★
4 reviews
Roscoe Moss Co
4360 Worth St, Los Angeles, CA 90063
4.5 ★
29 reviews
Berchtold Water Well & Pump
2762 St Lawrence St #2013, Riverside, CA 92504
5 ★
2 reviews
Frequently Asked Questions
How much does a complete well installation cost in California?
A complete well installation typically costs $12,000 to $25,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. Bedrock wells are at the higher end. State permitting requirements, mandatory water quality testing, and well completion reporting add to the total cost.
What's included in a complete well installation in California?
A complete installation includes state-required permits, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and mandatory initial water quality testing per state code.
How long does it take to install a complete well system in California?
The entire process typically takes 4-8 weeks from permit application to final approval. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing and electrical connections 1-2 days. Water testing results take 5-10 business days. Permit and inspection timelines vary by jurisdiction.